Features
-
Concurrently maintainable
Concurrently maintainable Mechanical and Electrical infrastructure -
Annualized
PUE < 1.3 -
Air-cooled (DX) and Chilled
Air-cooled (DX) and Chilled Water distribution system -
Gross floor area
296,000 sqft -
Additional
Additional 5.6MW IT load to be ready in Sep 2024. -
Dedicated
Dedicated 33kV substation on site, dual path TNB power source